◆ Preliminary budget
Once the project is defined, the framework and functions of the next steps are set. A good beginning is half done. It is a process of identification, analysis and deletion to find the best solution. We focus on overall equipment and production issues, determine performance requirements, summarize operational information, resulting in a complete production line and budget. So we can come up with an availability scheme. All information will be kept strictly confidential.
◆ Quotation
Once the project is finalized, a quote can be obtained. The information provided shall include general overview, description of quotation requirements, technical requirements and description of the system, equipment performance and others. This enables you to make a fair judgment on parts and quotations, systems and manufacturers when choosing a partner.
◆ Design
Once the elements of the offer are determined, the engineering team takes over, and regular meetings between the engineering manager, sales staff, and client are used to understand all the details and obtain a final set of documents. Documents are reviewed for use in manufacturing and field work.
◆ Most of the equipment purchased is self-selected to ensure compatibility and facilitate the project schedule. This is more conducive to shorten the lead time and fast delivery.
◆ Manufacturing
Approved documentation is the basis for manufacturing, and all off-site equipment is certified by our quality control experts to comply with strict regulations. Regular inspections are conducted to ensure that sub-suppliers also meet the required quality standards.
◆ Test and check
All systems are checked according to the usual protocol. If you follow your own method of inspection, we can also arrange for you.
◆ Delivery and equipment start-up
Based on many years of experience, the installation procedure will facilitate the start-up and commissioning of the equipment. During the installation and commissioning of the equipment, our engineers will go to the site to give guidance, and test and check the equipment project. These results will be submitted to the Buyer's representative for review and upon acceptance will indicate acceptance of the system。
◆ Training
Prior to installation and equipment start-up, the operator will receive training, which may be on-site explanation and operation and maintenance training.
◆ Maintenance Service
In order to ensure the normal operation of the production, maintenance and spare parts can be provided by Zhaojue Machinery Company, we can draw up a maintenance service agreement for a single machine, several lines or the whole plant, which may be part of the original contract, of course, it can be agreed at a later stage after the equipment has just been put into operation.